Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Set-up and safety technical clarificaiton - full framing Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shizha

by:Shizhan     2020-08-27
Four demolition of 4. 1 in front of the dismantled scaffold for accurate work shall meet the following requirements: 1 should be comprehensive review of scaffold fasteners to connect, support system, whether conform to the requirements of the structure; 2 should be according to the result of check complement dismantling sequence and measures in perfecting the construction organization design, by the competent department approval to implementation; 3 scaffolding sundries shall be removed and ground obstacles. 4. 2 to dismantle scaffold, shall meet the following requirements: 1 dismantling operation should be carried out step by step a top-down, forbidden and homework at the same time; 2 when the scaffolding down to the lower end a long the height of the vertical rod ( About 6. 5米) Set-up temporary cast, should be in place after the reinforcement, and demolition of the wall; 3 when scaffolding to staging, discrete surface removal, for not dismantle scaffold at both ends, and should be even wall) and the transverse diagonal reinforcement. 4. 3 discharge shall meet the following requirements: 1 all the components are strictly prohibited thrown to the ground; 2 shipped to the components of the ground should be timely inspection, repair and maintenance, and according to the varieties, specifications code heap to store at any time. 5 the safety management. 1 scaffolding, staff must be after according to the current national standard 'special operations personnel safety technical inspection management rules' ( GB 5036) Such as the inspection qualified scaffolder. Mount guard personnel should be regular physical examination, eligible may show certificates. 5. 2 erection of scaffolding workers must wear safety helmet, wearing a seatbelt, wearing non-slip shoes. 5. 3 scaffolding components quality and build quality, should be in accordance with the provisions, qualified rear must use. 5. 4 homework layer on the construction load should comply with the design requirements, shall not be overloaded. Shall not be template bracket, cable wind rope, pumping concrete until fixed on the scaffold; It is forbidden to hang lifting equipment. 5. 5 when six and six more wind and fog, rain and snow weather should stop when the scaffolding, and demolition work. 5. 6 use scaffolding, should check the connection of bar Settings, the structure of the support and the truss was conformed to the requirements; If there's any loose for ground water, the base, poling is suspended; Whether the fasteners loose; Scaffolding verticality deviation; Safety protective measures is in accordance with the requirements; If the overload. 5. 7 during the use of scaffolding are strictly prohibited to dismantle the master node in the longitudinal and transverse horizontal pole, sweep the floor and the wall. 5. 8 May not be on the basis of the scaffold and adjacent area to mining operations, or security measures should be taken. 5. 9 on the scaffolding, when electricity, gas welding, must have a fire prevention measures and personnel guards. 5. 10 take down the scaffolding, the ground should be set fencing and warning signs, and hold people to keep and prohibit the operation personnel to enter.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...