Set up safety technical clarificaiton - up Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shizhan security

by:Shizhan     2020-09-06
Project name jingbo scenic museum and supporting service facilities project construction unit building sixth engineering co. , LTD in China ( A) Engineering disclosure content up erect high security technology operating rules of the erection work content of the safety technical disclosure: a, every classics doctor is diagnosed with high blood pressure, heart disease, severe anemia, epilepsy and other unfavorable conditions personnel engaging in the operations in which high, shall not engage in high erection work. Second, the personnel engaging in the operations in which high set up class high must receive special security technology training and examination, obtain special operation certificate after the operation, party must mount guard operation. Three, high construction workers must wear personal protective equipment, qualified by the regulation banning barefoot, wear slippers, shoes. The correct use of seat belts. More than four, erection of poling scaffold, independent tall scaffolding, cantilever rack, hanging bar and special use scaffolding, etc. , must prepare the construction scheme by technicians in advance and strictly implemented. According to the standard requirements, steady build-up. Targeted clarificaiton will climb up erect homework personnel must wear personal protective equipment, qualified by the regulation banning barefoot, wear slippers, shoes. The correct use of seat belts. Disclosure ( Signature) Technical director, director of security time time time for disclosure ( Signature) Five, scaffolding started to 3 ~ 4 step, should be set support, support into 60 degree Angle with the ground, distance is not more than seven root rod. Timely setting wall structures and buildings with prison, ensure the overall stability of the frame body. Must be set on the corner of scaffolding end, bracing, the bracing 45 ~ 60 degree Angle with the ground, continuous set up from the bottom up. Six, scaffolding around the building should be synchronous build-up, form a closed structure. If not closed, at the end of scaffolding, setting wall rod in order to increase stability. Seven, operation process, the ban on the edge of the guard railing, platform and holes sitting, depend, not lying on the scaffolding or scaffold under the rest. Eight, in more than six levels of wind or rain, fog and other bad climate, and at night and insufficient light, should stop open up dangerous operations.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...