20 meters aluminum alloy scaffolding full build process method, two layer from the bottom of the first set, and then installed on the brace ( 20 meters high required plus a brace) Accessories, and then from the bottom of the transportation to the upper one layer upwards assembling, structures, process, the workers need to fasten safety rope. Not only is 20 meters to 30 meters. Carried out in accordance with the steps, step by step. http://www。 iqiyi。 com/w_19sb5u6ffx。 htmlhttps: / / haokan。 百度。 com/v? vid=5145627835547958433