Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Socket type plate buckles type steel pipe scaffold advantage, jiangsu shizhan scaffolding tell you - Industry dynamic - Aluminum alloy scaffolding manufacturer

by:Shizhan     2020-09-06
1. Socket plate buckles type steel pipe scaffold support the position of the vertical pole is determined according to the special construction scheme, and shall not be arbitrarily set. 2. According to the requirement of the vertical pole position, according to the location of the stud set adjustable base, and then by means of the wedge pin buckle joint fastening, the four vertical rod, form the basic framework of unit on the vertical bar connection, form the basic framework of unit, the whole support system to extend and build. In vertical direction, set up after the second layer should be built on the first floor, and so on. 3, adjustable base and washer should be placed on the positioning line accurately, level, the gasket should level off, not warp, cannot use the crack plate buckle. 4. Vertical rod should be vertical rod and casing connection, and the adjacent vertical bar at the same level in the position of the connection joint should be staggered; Horizontal bar should through the pin buckle joint and connection plate connection, and apply the hammer fixed pin plug socket, to ensure reliable connection between horizontal and vertical pole. 5. Button base after each step, should be timely correction horizontal vertical rod rod step distance, vertical distance and the horizontal distance, vertical rod level of vertical deviation and horizontal deflection of rod. The vertical deviation control lever should not be greater than H/M, should not be greater than 50 mm. 6. Button should be solid steel tube scaffold installation should cooperate with the template structure, and can be used adjustable base and adjustable bracket to bottom die height adjustment. 7. When undertaking multi-level continuous construction, on the bottom should be on the same axis. 8. Scaffolding, after the completion of the construction engineering technical personnel shall organize relevant personnel for acceptance before pouring concrete, and prior to conform to the special construction scheme shall not be pouring concrete. 9. Socket plate buckles type steel pipe scaffold demolition demolition order should according to the construction scheme of the design. Demolition of homework should be at the top level, the lower level should be carried out in accordance with the first after the demolition of the principle of the construction at the same time. Structural parts shall be bound to transport or artificial transferred to the ground, it is forbidden to throw. In the demolition of the section and elevation, it shall determine the technical scheme of the border, to ensure that the temporary structure stability after segmentation. Our factory tengda scaffold provide socket type disc type steel pipe scaffold, product parts adopt galvanized anti-corrosion treatment, durable, beautiful and easy, is an ideal auxiliary construction and decoration industry construction scaffolding, style variety, free combination, modular design, especially suitable for narrow place, complex building, parking lot, inward and outward, gate house, billboards, construction, decoration, maintenance.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...