Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

The construction site - scaffolding safety management system Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shizha

by:Shizhan     2020-08-29
1, the scaffold must be in view of the engineering structure, set up independent security construction plan, after examination and approval in accordance with the project construction. 2, scaffolding set-up must be in accordance with state of the construction fastener type steel pipe scaffold safety technical specifications '( JGJ130 - 2001). The provisions of the set-up. 3, scaffolder must undergo training assessment of the specialized institutions, with a valid certificate can work at his position. 4, scaffolder during operation must strictly carry out security technology operating rules, the proper use of labor safety and protective equipment, must do a good job in security work in the construction process. 5, the erection process, scaffolding safety protection must be made in a timely manner. If the rail strapped down, have loose phenomenon must be fixed in time. Before coming off work must check of scaffold and its surrounding, to see if there is a hidden trouble, if there is a hidden danger to reinforce the protection in place in time, before work. After 6, scaffolding, must go through construction and technical personnel, security officer, scaffolder monitor by & other A three-step acceptance & throughout; Use system on the acceptance before delivery. 7, the scaffold must have regular inspection, maintenance, and acceptance, maintenance record.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...