Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

【 The subway scaffolding 】 Removed carefully for you no harm! Subway painted scaffolding button bowl painted scaffold wheel scaffold - Jiangsu Shi

by:Shizhan     2020-09-29
【 The subway scaffolding at http://www. atjsj。 com/products- 细节。 asp吗? cpid = 27】 Demolition requirements: 1) Demolition work shall be carried out step by step a top-down, forbidden and homework at the same time; 2) Even the wall parts need removed one by one with hands and feet, it is strictly prohibited to remove the diaphragm wall a whole layer or layers of after the dismantled scaffold; Segmented demolition of elevation difference should not be more than two steps, such as the elevation difference is more than two steps, should add the wall a reinforcement; 3) When the scaffolding down to the height of the lower after a long standing pole, About 6. 5米) Set-up temporary cast, should be in place after the reinforcement, the demolition of the wall; 4) When the scaffolding to staging, discrete surface removal, not dismantle scaffold at both ends, even the wall piece should be set up and reinforce the transverse brace.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...