Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Ticket - scaffolding demolition of safety Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shizhan security

by:Shizhan     2020-09-04
Application related units, construction units or year month day operation time of the region points to year month day job site job content risk identification risk reduction measures qualification ( 〇/报; ) Production risk 1 no construction plan must provide the feasible construction scheme 2 unlicensed operation lead to personal injury operation personnel must have a special operation operation certificate 3 bad work environment scaffold from power facilities to maintain a safe distance from four areas have other productive operation avoid cross operation, 5 involving other homework when necessary to stop the work not related operation ticket shall deal with the high security operation ticket and other risk reduction measures: application, head of the unit operation signature: job risk 1 homework personnel not clear job content to ensure that all workers have accepted construction technical clarificaiton 2 demolition job did not order on should be carried out step by step a top-down, forbidden and homework 3 irrelevant personnel to enter areas at the same time set the alert area, the workers no admittance 4 to throw cast steel pipes, fasteners and other demolition materials should go into the transfer or use rope hanging under 5 labor protection articles don't mind hard hat and goggles all mind against the splash and protective shoes/portable gas detector mind since the back type air respirator and welding helmets/gloves/belt/editor/earplugs to escape; Other: other risks and reduction measures: the construction unit responsible: job preparation: I am more than content have been read, and have clear job content and requirements of safety protection, ready for operation. Homework personnel name type of work is the holder's name name type (type of work is the holder of care workers Post) Homework: I have been alive to the danger of possible this assignment, and has set up a ensure that develop and implement the relevant safety measures. , head of the construction unit or leadership opinion: year month day points when the relevant unit: year month day points to apply for the unit head of opinion: year month day points to apply for the unit leadership opinion: year month day time points when the completion acceptance: year month day, head of the points to apply for the unit operation signature: note: 1, identify, and cuts that people in implementing item of author, before implementing a painting & times; 2, the operation ticket storage life is one year
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...