Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Unknown devotees: subway scaffolding scaffolding @ @ subway doors scaffold custom @ efficient mobile scaffold - Jiangsu Shiz

by:Shizhan     2020-09-28
The scaffolding, basic demands 1, scaffolding foundation level off, the medium plate holes set-up, adopt i-steel stud base application big nail fixed on the wood. 2, extension of poling seam should be staggered, namely layer stud should be 1. 8 m and 3. 0 m poling stagger arrangement, are all use up 1. 8 m poling, to top with two kinds of the length of the vertical rod leveling. 3, poling edge metope with 65 cm advisable. 4, the vertical degree of stud should be strictly controlled, control standard is 2 meters height deviation 2 cm. 5, subway scaffolding assemble to 3 layer height, use theodolite check the levelness of the rail and poling verticality, and in no load cases one by one to check the stud base for loose or air float. 6 and oblique in enhancing the overall stiffness of scaffold poles and the relationship between the bearing capacity is very big, should be 1. 8m*1. 8 m requirements set, should not be casually down. Due to the need of operation temporarily removed, at the same time must be strictly controlled to dismantle the root number, and then in a timely manner. For more, please telephone contact us or click to http://www. atjsj。 com/products- 细节。 asp吗? cpid = 27
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...