Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

What are the key mobile scaffolding erection of step? Engineering - scaffolding manufacturer Industry dynamic - - aluminum alloy scaffolding manufacturer Focused on aerial work platform

by:Shizhan     2020-08-24
Movable scaffolding is also called: scaffold, door frames, door frames, scaffolding, — Is mainly composed of main frame, horizontal plane, cross arm, scaffolding, adjustable base, etc. Activity of scaffolding is first developed in the United States. By the early 1960 s, Europe, Japan and other countries have application and development of the scaffold. 1. Mobile scaffold, must strengthen the basis of drainage slope should be prepared to prevent water 2 mobile scaffold erection sequence is: the base to prepare to put plate, put the base to build-up two monomer doorcase, rail installation to install scaffold board, on the basis of repeated installation program 3 frame, beams and planks. Door type steel pipe scaffold set-up, from one end to the other end of the step on the scaffold should be in the next step after the completion of the scaffold erection of installation direction contrary to the next step. 4 in the first step on the scaffolding, first insert the two portal rigid frame base on the endpoint, and install the lever to lock in a fixed lock, and then the erection of the follow-up frame of door type. For each door frame, shall be immediately installed rail and locking parts. 5, the scaffold must be to establish a reliable connection with building 6. Door type steel pipe scaffold lateral bracing should be set up, the longitudinal and ZongXiangYing continuous Settings
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...