Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Wheel button scaffolding manufacturer produces the lowest price the cheapest round button scaffolding leasing fees whether - to make money Hainan sky - aluminum alloy scaffolding manufacturer

by:Shizhan     2020-09-05
Hainan aerial aluminum alloy scaffolding contact telephone: 18420150310 round button scaffolding manufacturer produces the lowest price the cheapest round button scaffolding leasing fees whether money, scaffold for wheel button manufacturer production wheel scaffold price 3600 yuan per ton site stud rail rod level pole standing column vertical rod manufacturer production planning with complete specification standard size. Commonly used specifications stud with 3 m, 2. 4 m, 2. 1 m, 1. 8 meters, 1. 5 meters, 1. 2 meters, 0. 9 meters, 0. 6 meters, 0. 3 meters, rail specification is 1. 5 meters, 1. 2 meters, 0. 9 meters, 0. 6 meters, 0. 3 meters, the vertical bar above contain sleeve at 100 cm, bar one. 2 meters refers to the center distance between two stud, 1. 2 meters rail actual length of 1. 15 m, and so on, factory in hebei cangzhou Ren Qiu. Public bar mainly adopts zero. 6 meters and 0. 9 meters, vertical pole 1. 2 meters and 1. 8 meters, the committee of rail 0. 9 m to 1. 2 meters, vertical pole 1. 8 m - 3. 0 m. Wheel button scaffolding hire benefit analysis: return on investment for a third, 3 years to recover the cost of steel pipe service life of more than 10 years, is one of the best non-profit project, for the standard layer of 3 m, stud the most commonly used 2. 4 m plus jacking, rail is the most commonly used one. 2 meters, if there are 4. 5 m, 4. 2 meters of floor can use 1. 5 meters, 1. 2 meters poling connection, at no cost, round buckle scaffold standard layer 3 1000 square meters to 20 tons, including stud rail jacking, 80000 yuan, 8 - a square 9 yuan, the investment need to be careful, 3 m standard layer need about 20 tons of stud rail is the ratio of 1:2, the relationship between the configuration of a stud two pillars and poling basement bar ratio was 1:3, the relationship between the configuration of a stud three pillars and rental fees for 2. - 1 / m/day 2. 9 points and/or the 100 - meters/day 150 yuan/ton/month or 3. 2 yuan - 4. 5 yuan/ton/day, depending on the different parts of the freight and custom, bridge and tunnel or high-rise buildings. About 3, 1000 square meters standard layer 20 tons of hainan aerial aluminum alloy scaffolding manufacturer
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...